The Election Is Over. What Does That Mean for the Steel in Your Next Project?
A practical conversation for self-storage investors and developers planning their next build.
If you’re getting ready to build a self-storage facility or expand one you already own, you’re probably wondering what the election results could mean for construction costs. Will steel get cheaper? Could tariffs change? Should you move forward now or wait until things settle down?
Those are reasonable questions when you’re putting real money into a project. When you’ve already invested in land, engineering and a feasibility study, a change in construction costs can affect whether the development still delivers the return you expected.
I’ve spent enough time around self-storage owners and development conversations to know that most investors aren’t looking for a political debate. They want to understand what could affect their project and what they can do about it.
With Democrats winning control of Congress and President Trump remaining in the White House, the election changes the balance of power in Washington. What it doesn’t give us is a clear answer about where steel prices go next. Existing steel tariff measures have been implemented through presidential action, and the election itself doesn’t remove them. Any change depends on the policy decisions that follow.
That matters because there is often a considerable distance between a campaign position, an actual policy change and a lower price showing up on your proposal.
Even if a tariff is reduced, your supplier may already own inventory purchased at a higher cost. Material may already be committed through a mill or fabricator. Freight, fabrication and installation costs have their own pressures. The practical implication is that policy relief could help, but developers shouldn’t assume the savings will be immediate or equal across every part of a building.
We also need to remember that tariffs are only one influence on steel pricing. Demand, production capacity, energy costs and availability all matter. Before the election, the Associated General Contractors of America reported that steel mill product prices had increased 27.6% between September 2025 and September 2026, along with availability concerns affecting some structural components. That doesn’t mean your next storage building will cost 27.6% more, but it does show why an older preliminary budget deserves another look.
For a self-storage investor, this becomes a question about how much uncertainty your deal can carry. You may have underwritten the project using a certain construction cost, opening date and lease-up schedule. If the steel package changes, or delivery slips far enough to delay opening, those assumptions need to be revisited together.
Consider a simple example. If your steel package is $500,000, a 10% increase adds $50,000. That is an illustration, not a price forecast. The question is what that additional $50,000 does to your equity requirement, financing and expected return. Then consider a delay separately. What happens if you carry the loan longer and begin renting units later than planned?
That is why I would encourage a serious developer to spend less time trying to predict the perfect buying day and more time understanding exactly where the project is exposed.
Start with the proposal sitting in front of you. Is it a budget estimate, a firm offer that expires on a specific date, or a committed purchase? Those serve different purposes. A number that helped you evaluate the land six months ago may no longer be a number you can build around today.
Ask your supplier what secures the price. Does signing the agreement do it? Is a deposit required? Do drawings need to be approved before material can be released? Are there provisions that allow tariff changes, freight increases or other costs to be passed through? You want to understand those answers before making commitments elsewhere in the project.
A deposit by itself is not proof that every cost is locked. The protection comes from the written terms and what they actually cover.
The next opportunity is bringing your steel supplier into the project early enough to contribute. By the time every dimension and detail has been finalized, some of the most useful opportunities to improve the package may already be expensive to revisit. Early coordination between the supplier, engineer and contractor can help identify whether the layout, spans, roof system and building dimensions make sense for the intended use.
For self-storage, those decisions also need to support the business plan. A construction saving needs to be evaluated alongside rentable area, unit mix, access and operating needs. The goal is a building that makes financial sense to construct and operate.
You should also make sure competing proposals cover the same work. Two totals can look comparable while carrying very different responsibilities for engineering, doors, freight, unloading or installation. Until those differences are understood, you haven’t established which proposal offers the better value—or what your actual project cost will be.
Once the scope and terms are clear, you can make a more informed decision about purchasing early. Securing material can reduce exposure to future increases, but it needs to fit your financing, permitting and site schedule. If the steel arrives before you can use it, storage, handling, insurance and cash requirements can eat into the benefit. Ask what happens if your site is delayed and who carries those costs.
For a phased storage development, I would also want to know how the purchasing plan lines up with each phase. Committing material for future buildings might provide some certainty, but it also ties up capital before those buildings produce income. That decision deserves the same attention you give the rest of the investment.
These principles apply just as much to flex space, warehouses and other steel projects. The details change, but the questions remain: How current is your budget? What is included? What is contractually secured? And how well does the purchasing schedule match the construction schedule?
At Edge Steel, that is the conversation I want to have with owners and developers. Understanding what you’re trying to accomplish, where you are in the process and what your investment needs to deliver gives us a better starting point for discussing the steel.
Nobody can promise to eliminate every market risk. You can, however, give yourself a much stronger position by coordinating early, checking your assumptions and getting clear commitments in writing.
Before you decide to wait on Washington, make sure you know what waiting would mean for your project.
Kevin Harless | District Sales Manager | Edge Steel 910-239-4979 / kharless@edgesteel.com